Saturday, January 13, 2007
Love Nest Album
Friday, November 24, 2006
Moving House (Part 2)
Tuesday, November 14, 2006
Moving House (Part 1)
Friday, October 27, 2006
DIY Study Table & Book Shelf
See what I've done yesterday and today: self assemble 2 study tables and 2 book shelves! They are from Ikea..
Steady hor? But quite tiring... wrist pain after all the hammering and screwing...
Thursday, October 19, 2006
Arrival of Electrical Appliances
Welcome the new members to our love nest!! Spent about $3k on them... or actually less than $2k as Dear's relatives sponsored us hehe...
LG i-sensor washing machine WFT65A31ECT
Sharp microwave oven R298H
Toshiba 3-door fridge GR-H45STV
Electrolux vacuum cleaner
That dream TV - Samsung 32" LCD TV LA32R71BMonday, October 16, 2006
The Mattress From Heaven
The Simmons mattress and the bed frame were delivered on last Sat!
The dream mattress... how I wish I can sleep on it... but according to Chinese tradition, it is said that if the bride sleeps on the bed before the customary wedding, she will suffer from poor health... 宁可信其有,不可信其无... have to wait another 2 months...
Friday, October 13, 2006
Bedsheet Set & Cushion Cover
According to Dear's grandma, the first bedsheet set is prepared by the bride's side.
Initially, I saw there is a sales at Metro... so bought one bedsheet set and a quilt. The bedsheet set is blue colour, thinking that it matches our master bedroom colour.
Then I had a weird dream - someone scolded me for buying blue colour bedsheet set for wedding! Dunno why I'm so bothered by this dream, and decided to get red colour bedsheet set. We went to Blissful Collection @Chinatown last nite. Actually wanted to get either the discount set with "喜喜" design (coz there is some defect with the bed runner), or the set with cute chinese couple (see the cushion cover picture below)... but think that after the wedding day, it is kinda weird... so in the end... see what I bought... it costs $160+!! Very expensive!! But the material is really very smooth!
We also bought 2 cute cushion covers with the chinese couple...
so cute!Mum sponsored the blue set as part of the 嫁妆... hehe... paiseh to ask her to pay for the more expensive set :p
Sunday, October 08, 2006
When a House Turns Into Home
Our sofa, TV console, dining table and sunflower stool were delivered yesterday! We spent some time to arrange the furniture and this is the best arrangement:

notice the sunflower stool near the entrance
Very cosy hor?
We also bought the curtains from Compass Point Metro... different colour for different room... the curtains are quite cheap, $17.90 - $18.90 only...
purple room with purple curtain
green room with cream curtainThe bed frame and mattress will be delivered next Sat! \(^o^)/
Sunday, October 01, 2006
入伙 Ceremony
Spent another weekend doing house cleaning...
On Sat, I touched up the paint while Dear cleaned the kitchen window grills. How to remove persistent grease on window grills? (Drum rolls...) Use Shell formula 92!! Yes... use petrol!! More efffective than other grease removers... and even the gloves cannot stand the petrol! Poor Dear cleaned until hand skin becomes very dry...
Dear's parents and grandma bought a fan and kettle for the 入伙 Ceremony on Sunday. Grandma told us to complete the task between 11 am to 12 noon. The moment we went into the house this morning, we had to switch on the fan and boil water, so that 风生水起 (wind from fan and boil water using the kettle)... then put oranges, pineapple, candies, tea leaves and 发糕 as offerings... burnt candles in the house and the incent paper at the corridor. Dear's mum threw some rice and salt on the floor before we left the house.
The furniture will be delivered this Sat... the next thing on the agenda is... pack things up and get ready to move! \(^o^)/
Thursday, September 28, 2006
Samung Home Theatre System
Initially did not think of getting any home theatre system... but after we got the Samsung LCD, think it would be better to have one to enhance the enjoyment... else it is such a waste to spend a bomb on the TV hahaha...
Dear found this in online forum... Samsung home theatre system HT-P10... the seller got it free with purchase of TV... original price is $300+ (as advertised)... we bought it at $140!!! Another good deal!
The seller let us test the system at his house... though it is just a basic home theatre system, it is good enough for us.
Need to think how to mount the rear speakers... hmm...
Tuesday, September 26, 2006
Renovation Completed!
Last Sat was the official hand-over of the flat... renovation is officially completed!
As we were not satisfied with the cleaning, and one of the items stated on the contract was not required to do, we asked the contractor to deduct the payable amount... so in the end we spent $4150 on renovation...hehehe...
Spent last weekend to do house cleaning again... we cleaned the wardrobes, shoe rack and window grills... Dear's dad helped to mount the curtain poles.
This coming Sat we will be going to settle some minor things and Sunday we will have 入伙 ceremony... we have also arranged the mattress, bed frame, sofa, TV console and dining table to be delivered on 7 Oct.
Some pictures of our love nest.. click the icon on the right or here to see the updated photo album...
living room
kitchen sliding doors
curtain poles
switches for light & heater in master bedroom
switches for lights in study room
switches for lights in living room
male maid at work
Sunday, September 17, 2006
Spring Cleaning!
Spent the weekend doing spring cleaning! 疲れた!!
The cleaners obviously didn't clean properly... the kitchen cabinet and window grills are still very oily... and dunno what acid they used to wash the homogenous tiles... the grouts are as dirty as before cleaning!
Let us see a magic show performed by me, Dear and Dear's mum on the grouts of homogenous tiles (take note on the grouts... the colour of the tiles is a bit weird due to insufficient lighting):
before scrubingDo u see the difference? (If your answer is no, please go and see doctor to check your eyesight)
How to do it? We used a chemical called Zoom Cleaner (bought by Dear's mum 5 years ago)... then scrubbed the grouts with a scouring pad... each single grout in the house!! Kneel down for 3 hours on Sat... until my knees are still painful today :p
Dear' dad is our electrician... helped us to change the sockets and switches to new ones. Sure u will not miss the switch of the light in the room!
king size switch for the lights
On Sunday, Dear and me spent 3 hours to clean the kitchen cabinet... yes it takes 3 hours for 2 persons to clean the kitchen cabinet only... coz it is super super dirty!! Can see the brown colour on the cloth... gotta use grease cleaner + CIF + magic sponge to make it clean!!
Round 2 of cleaning the coming weekend... to clean the wardrobes, window grills and shoe cabinet... muscle ache now :p
Sunday, September 03, 2006
Our "Chio" TV! Renovation Almost Done!
Initially we wanted to get a 29" CRT TV coz of the low price, around $500 only... and thought that since it is not HD era yet, it is not necessary to get a HDMI TV now.
Yesterday, Dear, his dad and me went to Audio House to take a look... the LCD TVs did not really catch my attention due to the high prices... I scanned through the price tags and ignored those that are more than $2k... until I came across this...

Samsung LA32R71B... 32" LCD!
Compared to other brands that are displayed next to it, its image appears to be brighter and richer in colour... and I would say that its design is super "chio"! Immediately fall in love with this TV! The selling price at Audio House is $2199, but there is rebate of $300 by Samsung... so it is $1899, less than $2k! This price is reasonable for such a "chio" TV!
Then we went to Hong Liang @Jalan Bukit Merah to compare price... it is $99 cheaper there. Think it is great to get a "chio" TV in our "chio" house... we finally bought this TV from HL today! Both happy and sad - happy to get the dream TV... sad to over-budget (by $1.3k!!)... Anyway, looking forward to the delivery of this "chio" TV!
Our renovation of the house is almost done... the kitchen door will be installed tomorrow...
Some pictures of our bedrooms with different colours...
Master bedroom - the blue room
blue room and the matching toilet door
Study room - the violet room (on the left... can't see clearly from the photo)
But we are very angry with the cleaning.. the acid wash did some damages to the homogenous tiles... then the cleaners also don't know how they clean... they make the window grills, sink and bathroom accessories very dirty... worse than if they don't clean them! And many places are not clean at all! I think that such cleaning does not worth us to pay $220! Will talk to the contractor tomorrow to see what can be done... Think if I do the cleaning, I'll do much better than those cleaners!!
Tuesday, August 22, 2006
Renovation More Than 50% Done!
Renovation more than 50% done!
Updates: kitchen solid-top, hob, aluminum backing at stove area, two toilet bi-fold doors, water heater, main door lock set and window grill lock installed...
Take a look at the surrounding of our love nest - convenient location, with community centre and Compass Point nearby... there is a bus stop and Shell station downstairs.
I'm quite satisfied with the kitchen solid-top... the colour really matches our cabinet! The sink is installed below the solid-top, looks very nice!
Look at the toilet doors... so colourful! The top one is the kitchen toilet, the other one is the master bedroom toilet.


It is only one week and so many things are done! Now left with painting, installation of tap & toilet accessories, washing and other minor stuffs... so happy \(^o^)/
Sunday, August 20, 2006
Cheap and Nice Stools
Wednesday, August 16, 2006
Renovation Started!
Renovation started today!
Our contractor quoted us $4.3k for the followings:
A. Carpentary work
- Supply labour to dismantle postform top for kitchen cabinet
- Supply labour to alter the kitchen cabinet for kitchen hood
- Supply labour and materials to install plywood for kitchen top
- Supply labour and materials to change the kitchen cabinet hinges
- Supply labour and materials to change the disk racks for kitchen cabinet
- Supply labour and materials to install stainless steel panel backing at stove area
- Supply labour to repair shoe rack drawer
- Supply labour to install hob and hood
- Supply labour and materials to install L-shape solid top for kitchen cabinet
B. Plumbing work
- Supply labour and materials to change flushing systems for two toilets
- Supply labour to install sink and sink tap
C. Air-con work
- Supply labour to chemical wash for system 2 air-con and fill up air-con gas
D. Painting work
- Supply labour to paint interial ceiling and wall for whole house (max 5 colours), including pipings, doors and door frames
E. Door work
- Supply labour and materials to install aluminium sliding door for kitchen entrance (3 slides)
- Supply labour to change main door lock set
- Supply labour and materials to install aluminium bi-fold door with arcyclic for two toilets
F. General work
- Supply labour to do acid wash for the whole house
- Supply labour and materials to install one twin socket at kitchen
- Supply labour to install heater in master room toilet
- Supply labour to install toilet accessories
- Supply labour and materials to install ceiling light holders for two toilets
Today is the first day and they have done quite a number of works... the corners at kitchen entrance, old toilet doors and postform kitchen top are removed... the place in kitchen cabinet where the hood are to be installed is altered... disk racks, sink and hood are installed.
We also informed the contractor the colour of paint we want... all from ICI. We are going to paint one wall of each room a different colour. The main colour is sail white... master bedroom has a blue (oceantide) wall... study room has a violet wall... another bedroom has a green (lime fizz) wall... living room has an earth colour (natural cane) wall... the doors will be painted dark brown (leather) and the gate will be painted light blue (swatch)... the pipings and bomb shelter door will be rose white in colour. As for the arc;ic of the toilet doors, we choose two colours for each door... the toilet in kitchen will be purple and yellow colour, while the one in master bedroom will be white and blue colour. Wow... our love nest is gonna be very colourful!
Sunday, August 13, 2006
Bought Kitchen and Bathroom Stuffs
We have bought the following items today:
- Rinnai Hood (RH382) and Hob (RV 2FV SV): $480
- Rectangular glass shelves for bathrooms (x2): $36
- Corner glass shelves for bathrooms (x2): $30
- Stainless steel double rail holders (x2): $52
- Stainless steel toilet roll holders (x2): $30
- Champs (Tiger) water heater: $110
- Sink: $98
- Tap: $32


Bought first 6 items from Poh Joo and last two from Royal Fanco... both are located at Jalan Besar. The friendly guy that we met at Poh Joo on Thu was not around today, then the guy who served us today was a bit turn-off type, but we still bought from them as the price is reasonable... tried to bargain but could only got a free 4 ft hose for the water heater... better than nothing.
Thursday, August 10, 2006
Kitchen & Bathroom Stuffs Hunting... Contractor Engaged
Spent two days to source for kitchen and bathroom stuffs... went to IMM yesterday and then to Jalan Bukit Merah & Jalan Besar today...
Shopping list:
- Hood
- Hob
- Kitchen sink
- Tap
- Toilet accessories (shelves, toilet paper holder)
- Heater
We went to Poh Joo this afternoon. We were served by a friendly staff, who was very helpful and told us about pros & cons of some of the products. He is not those hard-selling salesperson, he even said that there was no obligation when he quoted us the prices as he knew that we were just doing our "homework". He even served us drinks though we didn't confirm buying from them. Where to find such saleperson nowadays? Really satisfied with his service and will buy from them this weekend.
For hood and hob, we have learnt something about them in the past two days... I couldn't differentiate these two terms last time and I have never used hood in my life haha! We are going to get Rinnai (Japanese brand) after reading the reivews from forums. Initially wanted to get three-burners hob (the stove), but think we cannot cook 3 dishes at the same time, so will get two-burners type. Though glass one looks quite nice, Rinnai only has black colour one, which does not fit our kitchen cabinet colour... will be too outstanding... getting stainless steel type. As for the hood (the one on top to suck the smoke), will be getting slim type with charcoal filter... cannot get chimney type as there is a cabinet on the top. Hood with charcoal filter is relatively easier to clean, suitable for a lazy person like me hehe.
For sink, due to the existing size of our L-shape cabinet, we can only buy a small single sink.
We have also engaged Andy as our contractor... he is recommended by my Singaporebride forum friend... think his price is reasonable... met him this evening to finalise the details of the contract, will be meeting him again on Sat to sign contract.
Sunday, July 30, 2006
Getting Things Done...
Met two contractors over the weekend... waiting for their quotation... one is recommended by friend while the other one is recommended by father-in-law. Think it is better to hire a contractor through the words of mouth rather than searching through newspaper / exhibition... more reliable.
Found that the colour of the bed frame we chose last time did not really match the built-in wardrobe... we remembered the colour of the wardrobe wrongly... thought it was walnut colour and so chose the bed frame to be cream + tan colur... but it is actually pine wood colour... so we decided to change to black frame. Think the black frame is elegant, and goes well with different colours of bedsheet.
Went to Ackerman @Toa Payoh to change the colour and fix the delivery date... will be getting all the furiture from Ackerman and Star Furniture on 28 Oct!
the display set @AckermanThursday, July 27, 2006
Before Renovation
Tuesday, July 25, 2006
The Beginning
On Sunday, we went to our love nest to do some tidying up and to meet up with the contractor recommended by our housing agent.
We swept the floor, took out some unwanted screws... and "hammered" the floor (of coz gently!!) as a symbol of 动土... so that the renovation work can start.
The first contractor we met seemed to quite sincere... but the price he quoted was a bit high... can u imagine changing the hinges of the kitchen cabinet and polishing up require $850?? Going to meet another contractor recommended by Dear's dad on this Sat...
The beginning of our journey of building up the love nest...
It Is Our Love Nest
Saturday, July 22, 2006
Collection of House Key
We have collected our house key this morning! So excited!! But also a bit heart ache after paying the housing agent fee (1% of selling price of house + GST!!... yes, also gotta pay GST on top of that 1%) and micellaneous fee (the seller paid till end of this year so gotta pay him back).
In the afternoon, Dear, his parents and me went to our house. We prayed prayed before opening the door, and when the door was opened, we rolled two pineapples into the house to bring good luck... also put a sponge cake 发糕 to symbolise prosperity.
So happy... looking forward building up our love nest! \(^o^)/
Friday, July 21, 2006
Final Inspection
Just went to the new house for final inspection before the handing of house key tomorrow.
Change toilet door for both toilets
Change the table top of kitchen cabinet
Wash the floor
Wash the toilet
Basically wash everything....
Finally getting the key tomorrow!! \(^o^)/
Friday, July 14, 2006
Collecting House Key on 22 July
Finally... we are getting the house key on 22 July!
Lucky it would be just before lunar 7th month starts, so we can start renovating our house!