Tuesday, August 22, 2006

Renovation More Than 50% Done!

Renovation more than 50% done!

Updates: kitchen solid-top, hob, aluminum backing at stove area, two toilet bi-fold doors, water heater, main door lock set and window grill lock installed...

Take a look at the surrounding of our love nest - convenient location, with community centre and Compass Point nearby... there is a bus stop and Shell station downstairs.

I'm quite satisfied with the kitchen solid-top... the colour really matches our cabinet! The sink is installed below the solid-top, looks very nice!

Look at the toilet doors... so colourful! The top one is the kitchen toilet, the other one is the master bedroom toilet.



It is only one week and so many things are done! Now left with painting, installation of tap & toilet accessories, washing and other minor stuffs... so happy \(^o^)/

0 comments: